SOTA Construction Services Inc. (SCS) is soliciting bids for the Wilkinsburg Train Station Phase # 3 Construction Project. SCS will be providing construction management services for the project. Project proposals shall be submitted to the SOTA Construction main office located at 80 Union Avenue, Bellevue, PA 15202. The project bid date is Friday, September 14, 2018 @ 11:00 A.M. There will be 2 pre-bid meetings for the project. Attendance is not mandatory but highly encouraged. Pre-bid # 1 will be held on Wednesday, August 29, 2018 @ 11:00 A.M. Pre-bid # 2 will be held on Wednesday, September 5, 2018 @ 11:00 A.M. Both pre-bids will be held at the project construction site located at Hay Street & Sawyer Way in Wilkinsburg, PA. The project has multiple prime contracts detailing the work-scope requirements. This project is subject to the PA Prevailing Wage Act as defined by the PA Department of Labor and Industry. The perspective Bid Packages are as follows: Bid Package 3A Selective Demolition Bid Package 3B Interior Structural Concrete Bid Package 3C Interior Restoration Marble, Stonework, Concrete, & Masonry Restoration Bid Package 3D Structural Steel, Miscellaneous Steel, & Steel Restoration Bid Package 3E General Trades Carpentry & Miscellaneous Construction Items Bid Package 3F Plaster, Plaster Repairs, & Glass Fiber Reinforced Plaster Bid Package 3G Drywall and Insulation Bid Package 3H Ceramic / Porcelain Tiling Bid Package 3I Hardwood Strip Flooring Bid Package 3J Epoxy Terrazzo Flooring Bid Package 3K Painting Interior & Exterior Bid Package 3L Toilet Partitions & Toilet Accessories Bid Package 3M Fire Suppression Sprinkler System Bid Package 3N Plumbing System Bid Package 3O HVAC System Bid Package 3P Electrical System Bid package documents will be available on Friday, August 24, 2018. They may be obtained by contacting Steve Salak @ SCS by phone/email. Phone (412) 766-4630 Ext. 115 / Email: SSALAK@ SOTACONSTRUCTION.COM
↧